WebRate analysis of earthwork, PCC, reinforcement, formwork, brickwork, plaster, tile etc. Civil Rate Analysis. ... 513.48 Item Rate per 1m3 513.00 Item Rate per 1cf 15.00 ... Analysis for 1 m3 S.N Description Quantity Unit Rate … WebIn india, labour rate/ cost for shuttering is range between Rs 20 to Rs 25 per sq ft which is approximately equal as Rs 200 to Rs 220 per sqm for normal residential work with shuttering materials such as ms sheet, …
ESTIMATING LABOR UNIT DATA FOR CONCRETE …
WebMar 20, 2024 · Cost of materials. Cost of cement per cubic metre concrete = 7 x 4,100 = ₦28,700. Cost of sharp sand per cubic metre of concrete = 3500 x 1.08899 = ₦3,812. Cost of granite per cubic metre of concrete = 16000 x 1.461 = ₦23,376. Total Material Cost = ₦55,888 per cubic metre of concrete. (b) Plant. WebThese are: Reinforced concrete slab – (m3) Rate – R1500 Steel reinforcement to slabs – (Tonne) Rate – R10,000.00 Formwork to soffits – (m2) Rate – R175 Striking off and floating top surface – (m2) Rate – R10 Plaster to concrete soffits – (m2) Rate – R30 Paint on plastered soffits – (m2) Rate – R30 Ceramic floor tiles – (m2) Rate – R250 platelets high hemoglobin low
SUMMARY OF RATE
WebThe quantity of Shuttering Required: 1. Plywood: Generally, the dimension of plywood used in regular construction is 8’x4′ and thickness is 12 mm. So plywood required = Covered area x Thumb rule = 1500 x 0.02 = 30 no’s. 2. Wooden Battens: Wooden battens required = Covered area x Thumb rule = 1500 x 0.04 = 600 rft. WebFeb 25, 2024 · Formwork Steel Panel (3mm MS Plate w/ 65mm x 6mm thk Angle Bar: 150mm X 1200mm: 0.18 square meters: 2599.4: 288.82: Formwork Steel Panel (3mm MS Plate w/ 65mm x 6mm thk Angle Bar: … WebMar 19, 2024 · Change of the cost of the average formwork per square metre over the. years. 8. ... case of the 22 buildings, the formwork area per cubic meter of the concrete. ... Analysis of casting rate for ... platelets high means what